Basic Information

BrandMG
SeriesGS
Year2017
First Registration2017/03
Mileage7km
Transfer Count-
FuelGasoline
TransmissionManual
Engine1.5T 169 L4
ColorOrigin
Seats5seats

Configuration Highlights

Driver/Passenger Airbags
ISOFIX Child Seat Anchors
ABS Anti-lock Braking
Electronic Brake Distribution
Seat Material
Low Beam Headlights
Daytime Running Lights
Adjustable Headlight Height
Power Windows
Climate Control Type
Rear Air Vents

Q&A

More

What is the latest time to request changes to the consignee and notify party on the bill of lading?

Changes must be requested before the shipping cut-off date (SI Cut-off Date) prior to the vessel's departure. Once the vessel has sailed, the shipping company will charge a high amendment fee, which may also cause delays in customs clearance at the destination port, with costs borne by the buyer.

If I choose to abandon cargo at the destination port due to a cash flow issue, can I get a refund of the deposit and freight I previously paid?

No, it is absolutely impossible to get a refund. Not only will there be no refund, but if the proceeds from the port auction of the abandoned cargo are insufficient to cover the exorbitant demurrage and disposal fees, the shipping company and customs will still pursue you (the bill of lading recipient) for the remaining debt through international legal proceedings.

How do you assess the leak risk of vehicles with panoramic sunroofs?

We maintain an absolute skeptical attitude. In addition to regular visual inspections, we focus on checking for sediment accumulation around the sunroof drainage channels and look for water stains under the A-pillar trim and front floor mats. This is the only effective physical evidence to determine if the sunroof drainage holes are blocked, leading to hidden leaks.

MG GS 1.5T 169 L4

名爵 锐腾 2017款 20T 手动都市版

EXW: $3,308
Car CodeSWA1612920
Publish Date2026/02/08