Basic Information

BrandHaval
SeriesM6
Year2018
First Registration2018/03
Mileage7.55km
Transfer Count1times
FuelGasoline
TransmissionManumatic
Engine1.5T 150 L4
ColorWhite
Seats-

Condition Description

Vehicle Source: Shuaiche Dongcheng Douyin lead Vehicle Condition Description: Original, 5-sided construction, right rear door sheet metal repair Electrical and Electrical Testing: Modified: Third-Party Inspection: Not conducted Document and Paperwork Complete: Not yet transferred to owner and awaiting sale, payment received from Shuaiche Rixin Transferred to Rixin

Configuration Highlights

Driver/Passenger Airbags
Front/Rear Side Airbags
Tire Pressure Monitoring
ISOFIX Child Seat Anchors
Keyless Start System
Keyless Entry System
ABS Anti-lock Braking
Electronic Brake Distribution
Electronic Stability Control
Hill Start Assist
Hill Descent Control
Roof Rack
Multifunction Steering Wheel
Seat Material
Rear Cupholders
GPS Navigation
Low Beam Headlights
Daytime Running Lights
Adjustable Headlight Height
Power Windows
Anti-pinch Windows
Climate Control Type
Start-Stop System

Q&A

More

If there are no specialized Chinese brand diagnostic computers overseas, how can we clear the maintenance reminder light during regular maintenance?

Most basic maintenance reminder lights (like for changing the air conditioning filter) can be manually cleared using a combination of steering wheel buttons or through the engineering mode on the central control screen. We will provide internal guidance manuals for these hidden operations to our B2B clients.

Why is exporting used cars called a "trust marathon"?

Because it's not a one-time transaction. Only by ensuring compliance checks, improving after-sales service, and providing parts can a good reputation be established, leading to repeat purchases and long-term cooperation.

What qualifications do the third-party testing organizations have? Are they internationally recognized (e.g., SGS)?

We mainly collaborate with professional organizations certified by China's national CMA (Certification of Inspection and Testing Institutions). If you need the highest level of international endorsement, we can arrange for independent inspection agencies like SGS or TÜV to conduct Pre-Shipment Inspections (PSI) before loading at the port.