Basic Information

BrandHonda
SeriesAvancier
Year2023
First Registration2023/09
Mileage2.3km
Transfer Count1times
FuelGasoline
TransmissionManumatic
Engine2.0T 261 L4
ColorGrey
Seats5seats

Condition Description

Original paint, check, two, 26.8

Configuration Highlights

Driver/Passenger Airbags
Front/Rear Side Airbags
Front/Rear Curtain Airbags
Tire Pressure Monitoring
ISOFIX Child Seat Anchors
Keyless Start System
Keyless Entry System
ABS Anti-lock Braking
Electronic Brake Distribution
Electronic Stability Control
Hill Start Assist
Auto Hold
Hill Descent Control
Adaptive Suspension
Panoramic Sunroof
Power Trunk
Kick-sensor Trunk
Roof Rack
Multifunction Steering Wheel
Paddle Shifters
Seat Material
Driver/Passenger Power Seats
Rear Cupholders
GPS Navigation
Low Beam Headlights
Daytime Running Lights
Auto Headlights
Adjustable Headlight Height
Power Windows
Anti-pinch Windows
Climate Control Type
Rear Independent Climate Control
Rear Air Vents
Start-Stop System
Lane Departure Warning
Active Safety System

Q&A

More

Will the type of refrigerant in the vehicle (such as R134a or R1234yf) be indicated on the export documents for environmental customs clearance?

Europe and some developed countries have very strict regulations on greenhouse gases. If required by customs, we will specify the exact refrigerant type and charge amount according to the vehicle's air conditioning compressor nameplate in the remarks section of the packing list and commercial invoice.

Will protective measures against rain or sun be taken for vehicles parked outdoors while waiting to be loaded at the port?

The storage area at the roll-on/roll-off terminal is entirely outdoors, which is standard practice at ports worldwide. During the few days vehicles wait to be loaded, they will inevitably be exposed to sun and rain and accumulate dust. We will not provide custom car covers as this would significantly hinder the efficiency of dock workers moving vehicles.

What is the latest time to request changes to the consignee and notify party on the bill of lading?

Changes must be requested before the shipping cut-off date (SI Cut-off Date) prior to the vessel's departure. Once the vessel has sailed, the shipping company will charge a high amendment fee, which may also cause delays in customs clearance at the destination port, with costs borne by the buyer.

Honda Avancier 2.0T 261 L4

本田 冠道 2023款 370TURBO 四驱尊享版

EXW: $33,985
Car CodeSWA1480274
Publish Date2025/11/13