Basic Information

BrandChangan
SeriesEado
Year2025
First Registration2025/07
Mileage4,500km
Transfer Count-
FuelGasoline
TransmissionDCT
Engine1.4T 160 L4
ColorWhite
Seats5seats

Condition Description

Vehicle in excellent condition, passed inspection, better than 80% of vehicles for sale, excellent condition, 2 claims filed, 0 ownership transfers.

This vehicle is 1 year old, with a short usage period, an average annual mileage of 0.45 million kilometers, and extremely low daily usage frequency. It has never been transferred to any other owner and is a good first-hand vehicle. The exterior is in excellent condition, with a glossy paint finish but possibly minor scratches. The interior is clean and tidy, with minor signs of use. The overall body frame is intact and without any abnormalities. The fluids are normal, and the powertrain operates smoothly without any issues.

Configuration Highlights

Kick-sensor Trunk
Surround View Camera
Smartphone Connectivity
High Beam Assist
Auto Hold
Keyless Entry
High-definition Low Beam
Engine Start-Stop
Auto Headlights
Cruise Control
Keyless Start
Rear Air Vents
Tire Pressure Monitoring
Heated Mirrors
Hill Start Assist
Rear Parking Sensors
Anti-pinch Windows

Q&A

More

How to confirm that the car windows are all original factory parts and not replaced due to an accident?

The technician will check the production date codes and brand logos in the lower left corner of all the car's glass (including the windshield, four doors, and rear window) to see if they match the vehicle's factory date on the nameplate. If any glass is found to have a date later than the vehicle's production date, it will be recorded as evidence of a "previous damage replacement."

Will B2B customers receive a detailed technical inspection report for each vehicle when purchasing a container of vehicles at once?

Yes. Even if you purchase 100 vehicles, we adhere to "one inspection per vehicle, one file per vehicle." Each vehicle will have its own independent inspection report with a unique VIN code, which serves as the sole proof for quality traceability.

What is the latest time to request changes to the consignee and notify party on the bill of lading?

Changes must be requested before the shipping cut-off date (SI Cut-off Date) prior to the vessel's departure. Once the vessel has sailed, the shipping company will charge a high amendment fee, which may also cause delays in customs clearance at the destination port, with costs borne by the buyer.