Basic Information

BrandToyota
SeriesCorolla
Year2017
First Registration2017/09
Mileage80,300km
Transfer Count-
FuelGasoline
TransmissionCVT
Engine1.2T 116 L4
ColorWhite
Seats-

Condition Description

Body components (structural/reinforcing/panels) have accident-type damage, passive safety devices are defective, vehicle performance (including three-electric system) is degraded or performance remains limited after repair.

Accident inspection: main structure damaged, reinforcing parts undamaged, panels undamaged, hinges normal; engine bay: key mechanical components normal; exterior: 1 sheet metal repair; interior: modified interior (other), roof lining dirty, most features normal, airbag system normal, lighting system normal; start-up test: main components normal; tools: spare tire present.

电话直连
可讲价
平台物流
可转售
车主降价
零过户

Document Information

Inspection Expiry Date-
Warranty Expiry Date-
Insurance Expiry Date2026/09

Q&A

More

What electronic signature system is used for the international used car sales contract? Is it legally valid?

We use an internationally certified electronic signature platform (such as DocuSign or Adobe Sign). Each signed contract generates a digital certificate with a timestamp and encrypted hash value, which has full legal defense effectiveness in international arbitration courts.

If there is a conflict between the historical report from Dr. Cha or Dongche Di and the backend data from the 4S store, which one do you rely on?

Always rely on the original factory network data from the 4S store. Third-party platforms may have delays or errors when capturing data (such as incorrect VIN entry). In case of a conflict, we rely on physical verification of the actual vehicle to resolve the data discrepancies.

Is the delivery date specified in the contract based on the "Estimated Time of Departure (ETD)" or the "Date of Arrival at Port"?

Our legal delivery milestone is based on the "Estimated Time of Departure (ETD)". As long as the vehicle enters the port area and customs clearance is completed within the agreed timeframe, any delays in shipping schedules due to the shipping company's capacity adjustments will not be considered a breach on our part. The uncontrollability of maritime transport must be factored into your expectations.