Basic Information

BrandAudi
SeriesQ3
Year2016
First Registration2016/08
Mileage90,000km
Transfer Count-
FuelGasoline
TransmissionDCT
Engine1.4T 150 L4
ColorWhite
Seats-

Condition Description

Vehicle has major accident/fire/flood damage or major defects in power battery components (structural/reinforcing/panel parts), repaired or unrepaired, still affecting body structural strength or safe use, with hidden faults.

Accident inspection: main structure damaged, reinforcing parts undamaged, panels undamaged, hinges normal; engine bay: key mechanical components normal; exterior: none; interior: most features normal, airbags normal, seatbelts normal, dashboard normal, instrument readings normal, lighting system normal; startup check: main components normal; tools: spare tire present.

电话直连
可讲价

Document Information

Inspection Expiry Date2026/08
Warranty Expiry Date-
Insurance Expiry Date2026/08

Q&A

More

Do you test the freezing point and purity of various fluids like antifreeze, engine oil, and brake fluid before export?

We conduct basic visual inspections and freezing point tests. If the antifreeze's freezing point is insufficient or the engine oil is severely degraded, we will document it. However, considering the shipping duration, we strongly recommend a comprehensive "Full Fluid Service" upon arrival.

Has this car previously been used as a test-drive car or display vehicle by a dealer?

Test-drive cars experience much more mechanical wear due to extreme conditions like cold starts and emergency braking compared to regular family cars. We can identify this by tracing whether the first owner was a 4S dealership or the manufacturer. If so, we will reassess its value based on "operational intensity" standards.

If the remittance info for the international wire transfer has the wrong contract number, will it cause delays in currency exchange and shipping?

It will cause serious obstacles. China's foreign exchange controls are extremely strict. If the remittance note and the remitter do not match our declared contract, the bank will reject the transaction (Pending). We will need to spend several days submitting additional explanations to the foreign exchange authority, which will inevitably delay the shipping schedule.