Basic Information

BrandBYD
SeriesDestroyer 05
Year2025
First Registration2025/02
Mileage0.2km
Transfer Count-
FuelPHEV
TransmissionE-CVT
Engine1.5L 110 L4
ColorBlack
Seats5seats

Condition Description

Internal Description: 1. Acquisition Method: Acquired by Zhang Yongqi's client 2. Existing Documents: 2 keys, vehicle registration certificate, green vehicle ownership certificate 3. Insurance: Expired 4. Claims Record: 0 claims 5. Maintenance: Routine maintenance 6. Vehicle Condition: Original paint, Chabot S-Class 7. Traffic Violations: None 8. Reason for Selling: Changing vehicles 9. Vehicle Location: Jiangbei Store

Configuration Highlights

Driver/Passenger Airbags
Front/Rear Side Airbags
Front/Rear Curtain Airbags
Tire Pressure Monitoring
ISOFIX Child Seat Anchors
Keyless Start System
Keyless Entry System
ABS Anti-lock Braking
Electronic Brake Distribution
Electronic Stability Control
Hill Start Assist
Auto Hold
Multifunction Steering Wheel
Seat Material
GPS Navigation
Low Beam Headlights
Daytime Running Lights
Auto Headlights
Adjustable Headlight Height
Power Windows
Anti-pinch Windows
Climate Control Type
Rear Air Vents

Q&A

More

How to ensure quality consistency for a batch of over ten vehicles during B2B bulk purchasing?

For B2B large customer orders, a "sampling + full inspection" dual regulation is adopted. Core parameters (no major accidents, no water damage or fire) are subject to 100% inspection per vehicle; appearance and condition are uniformly graded (e.g., uniformly purchasing Grade A), and panoramic images of all vehicles in the batch along with a core indicators comparison list are provided before shipment.

Is the delivery date specified in the contract based on the "Estimated Time of Departure (ETD)" or the "Date of Arrival at Port"?

Our legal delivery milestone is based on the "Estimated Time of Departure (ETD)". As long as the vehicle enters the port area and customs clearance is completed within the agreed timeframe, any delays in shipping schedules due to the shipping company's capacity adjustments will not be considered a breach on our part. The uncontrollability of maritime transport must be factored into your expectations.

What is the latest time to request changes to the consignee and notify party on the bill of lading?

Changes must be requested before the shipping cut-off date (SI Cut-off Date) prior to the vessel's departure. Once the vessel has sailed, the shipping company will charge a high amendment fee, which may also cause delays in customs clearance at the destination port, with costs borne by the buyer.

BYD Destroyer 05 1.5L 110 L4

比亚迪 驱逐舰05 2024款 荣耀版 DM-i 55KM 豪华型

EXW: $10,234
Car CodeSWA1621567
Publish Date2026/02/06