Basic Information

BrandBYD
SeriesSong Plus New Energy
Year2024
First Registration2024/10
Mileage40,000km
Transfer Count1times
FuelPHEV
TransmissionE-CVT
Engine1.5L 101 L4
ColorGrey
Seats5seats

Condition Description

2024 model, registered in October 2024, with 40,000 kilometers. Original paint, no accidents reported.

新能源
SUV
自动
维保开放
事故开放
查验开放

Configuration Highlights

品牌: 比亚迪
车系: 宋PLUS新能源
车型: 2025款 DM-i 160KM 旗舰型
车身类型: SUV
座位数: 5
排量: 1.5L
变速箱: 自动
能源类型: 新能源
VIN: LGXC74C44R0636208
搜索关键词: 比亚迪宋PLUS新能源 2025款宋PLUS新能源DM-i160KM旗舰型

Document Information

Inspection Expiry Date2026/10
Warranty Expiry Date-
Insurance Expiry Date2026/10

Q&A

More

How long does it usually take from when I pay the full amount to when the vehicle is loaded at the port in China?

Under normal circumstances, it takes 15 to 25 working days. This includes: domestic transfer of ownership (3-5 days), applying for an export license (3-5 days), inland trucking to the port (2-5 days), customs inspection and waiting for loading schedule (5-10 days). Do not trust false promises from other channels claiming 'loading within a week.'

What core export documents will you provide to ensure smooth customs clearance locally?

After receiving the final payment, we will send you the complete set of original customs clearance documents via DHL or FedEx, which typically includes: - Bill of Lading (B/L) - Commercial Invoice - Packing List - Certificate of Origin (CO) - Used Vehicle Export License issued by the Ministry of Commerce of China Note: If your local customs requires additional documents (such as VIN consistency certificate), please inform us in advance before shipping.

If the remittance info for the international wire transfer has the wrong contract number, will it cause delays in currency exchange and shipping?

It will cause serious obstacles. China's foreign exchange controls are extremely strict. If the remittance note and the remitter do not match our declared contract, the bank will reject the transaction (Pending). We will need to spend several days submitting additional explanations to the foreign exchange authority, which will inevitably delay the shipping schedule.