48H

Basic Information

BrandBYD
SeriesYuan Plus
Year2024
First Registration2024/06
Mileage12,500km
Transfer Count-
FuelElectric
TransmissionOther
Engine-
ColorWhite
Seats5seats

Condition Description

Localized body damage or repair marks present; no accident-related damage or repairs to structural or reinforcement components. Vehicle performance (including battery, motor, and electronic control systems) has degraded or is performance-limited.

Accident inspection: no damage to main structure, reinforcement parts, or cover panels; hinges normal. Three-electric (battery/motor/electronic control) inspection: normal. Engine bay inspection: key mechanical components normal. Exterior: 1 panel repair (body filler) present. Interior: most features normal; airbags, seat belts, dashboard, instruments, and lighting system normal. Startup inspection: major components normal. Tool kit: absent.

独家上新
电话直连
可讲价
平台物流
可转售
新能源
零过户
新检测标准升级>
非泡水

Document Information

Inspection Expiry Date2028/06
Warranty Expiry Date-
Insurance Expiry Date2027/06

Q&A

More

How can I estimate the warehousing and transshipment costs if I choose to conduct transshipment trade in Hong Kong or Dubai?

We are only responsible for delivering the goods to your designated transshipment port (such as Jebel Ali Port in Dubai). The warehousing fees, customs clearance fees, and storage fees for re-export within the free trade zone need to be calculated separately with local freight forwarders.

What are the typical steps and timeline when buying a used car from China, from selection to delivery at my port?

A normal transaction moves through six stages. First, selection and verification: you shortlist cars, request VIN-level documents, and order an independent inspection (1-2 weeks). Second, contract signing and deposit: 10-30% is standard, paid against a signed contract listing the VIN and agreed spec. Third, export preparation: the seller handles deregistration and export licensing (1-3 weeks). Fourth, final payment against loading: pay the balance only after you receive the bill of lading or rail waybill number you can track. Fifth, transit: ocean shipping to most ports takes 3-6 weeks, rail to Central Asia or Europe 2-4 weeks. Sixth, destination clearance and registration: allow 1-2 weeks plus buffer for inspections. In total, plan for 2-4 months door to door. Any exporter promising full delivery in under six weeks is likely cutting corners on export paperwork.

Will the platform ask the buyer for an additional "service fee" or "commission" after the transaction is completed?

No hidden fees. The total amount on the FOB/CIF invoice is the final amount. We rely on professional supply chain operations to earn a reasonable margin and do not allow any sales personnel to privately request kickbacks or service fees from you.