Basic Information

BrandGEELY
SeriesBinray
Year2022
First Registration2022/01
Mileage32,500km
Transfer Count-
FuelGasoline
TransmissionCVT
Engine1.4T 141 L4
ColorWhite
Seats-

Condition Description

Vehicle performance is good. Structural, reinforced, and cover panels have no accident-related damage or repairs. The three-electric system (battery, motor, electronic control) has no damage.

Accident inspection: main structure, reinforced parts, cover panels, and hinges are normal. Engine bay: key mechanical components are normal. Exterior: no issues. Interior: most features are normal; airbags, seatbelts, dashboard, instruments, and lighting system are normal. Start-up inspection: main components normal. Tools: spare tire present.

电话直连
可讲价
平台物流
可转售
车主降价
零过户
非泡水

Document Information

Inspection Expiry Date2027/01
Warranty Expiry Date-
Insurance Expiry Date2027/01

Q&A

More

If overseas customers accidentally update the car system causing the UI to switch to full Chinese and cannot revert to English, can you downgrade remotely?

Once the car system (especially in a closed ecosystem) undergoes a major version upgrade, its bootloader is usually locked, preventing downgrades. If this happens, there is basically no solution in an overseas environment. Therefore, we strongly warn: do not blindly insert a USB drive to upgrade while offline.

How to ensure compliance for countries that strictly prohibit the import of vehicles containing any asbestos (like Australia)?

Chinese passenger cars produced after 2005 have fully transitioned to asbestos-free brake pads, clutch plates, and gaskets. However, for export to countries with strict regulations, buyers must pay for sampling and testing by a NATA-accredited laboratory before shipment, and obtain an asbestos-free certificate.

How long does it usually take from when I pay the full amount to when the vehicle is loaded at the port in China?

Under normal circumstances, it takes 15 to 25 working days. This includes: domestic transfer of ownership (3-5 days), applying for an export license (3-5 days), inland trucking to the port (2-5 days), customs inspection and waiting for loading schedule (5-10 days). Do not trust false promises from other channels claiming 'loading within a week.'