Basic Information

BrandGEELY
SeriesCoolray
Year2021
First Registration2021/10
Mileage46,000km
Transfer Count1times
FuelGasoline
TransmissionDCT
Engine1.4T 141 L4
ColorWhite
Seats-

Condition Description

Localized body damage or repair marks present; structural and reinforcement components show no accident-related damage or repairs. Vehicle performance (including three-electric system) has degraded or is performance-limited.

Accident inspection: main structure undamaged, reinforcement components undamaged, cover panels damaged, hinges normal. Engine bay: key mechanical components normal. Exterior: 3 repainted areas. Interior: left front seat rail and mounting screws show disassembly marks; right front seat rail and mounting screws show disassembly marks; most features normal; airbag system normal; lighting system normal. Startup inspection: main components normal. Onboard tools: missing.

电话直连
可讲价
平台物流
可转售
车主降价

Document Information

Inspection Expiry Date2027/10
Warranty Expiry Date-
Insurance Expiry Date2026/10

Q&A

More

What is demurrage? How to avoid it?

Demurrage is a penalty charged by the port or shipping company for not clearing and picking up goods on time after they arrive. To avoid it: send customs documents in advance and ensure the recipient is prepared with duties and import qualifications.

What are the differences in power loss performance of used lithium iron phosphate (LFP) and ternary lithium (NMC) batteries in cold countries?

If your market is in extremely cold regions (like Russia or Northern Europe), we strongly recommend purchasing ternary lithium (NMC) models equipped with heat pump air conditioning. The range achievement rate of used LFP batteries typically plummets at minus 15 degrees, and we will alert you accordingly.

Will my SWIFT international wire transfer be delayed due to intermediary bank issues, causing the vehicle to be resold?

As long as you provide us with a genuine and valid bank SWIFT MT103 wire transfer message (receipt) within the payment deadline specified in the contract, we will reserve the vehicle and continue with the port operations, even if the funds are held up in the intermediary bank for several days.