Basic Information

BrandGEELY
SeriesCowboy
Year2026
First Registration2026/01
Mileage8,700km
Transfer Count-
FuelGasoline
TransmissionDCT
Engine1.5T 181 L4
ColorGrey
Seats5seats

Condition Description

Vehicle performance is good. Structural, reinforced, and cover panels have no accident-related damage or repairs. The three-electric system (battery, motor, electronic control) has no damage.

Accident inspection: main structure, reinforced parts, cover panels, and hinges have no damage or abnormalities. Engine bay inspection: key mechanical components are normal. Exterior: no issues. Interior: most features are normal; airbag, seatbelts, dashboard, instruments, and lighting systems are normal. Startup inspection: main components are normal. Onboard tools: none.

Fixed price
VIP车源
零过户
新检测标准升级>
非泡水

Document Information

Inspection Expiry Date2027/01
Warranty Expiry Date-
Insurance Expiry Date2027/01

Q&A

More

Will B2B customers receive a detailed technical inspection report for each vehicle when purchasing a container of vehicles at once?

Yes. Even if you purchase 100 vehicles, we adhere to "one inspection per vehicle, one file per vehicle." Each vehicle will have its own independent inspection report with a unique VIN code, which serves as the sole proof for quality traceability.

Can this car be exported to a certain country? What are the local restrictions?

We have established a database of target country policies. Check the specific requirements of the destination country in advance regarding vehicle age (left-hand/right-hand drive), emission standards (Euro 4/Euro 5), and steering position (left-hand/right-hand drive) to avoid customs clearance issues upon arrival.

Will you provide photos of the loading site as soon as the vehicles are loaded (On Board)?

Unauthorized personnel are prohibited from entering and taking photos inside the roll-on/roll-off ship, but we will provide photos of the vehicles parked in the loading area with the ship in the background. The bill of lading marked "Shipped on board" with the date is the most essential legal proof of loading.