Basic Information

BrandGEELY
SeriesEmgrand
Year2016
First Registration2016/10
Mileage90,000km
Transfer Count1times
FuelGasoline
TransmissionCVT
Engine1.5L 109 L4
ColorBrown
Seats-

Condition Description

October 2016 Geely Emgrand, 1.5L automatic. Owner's personal car, excellent condition. Fees are up to date.

燃油车
轿车
自动
Inspection report
维保开放
事故开放
查验开放

Configuration Highlights

✓品牌: 吉利汽车
✓车系: 帝豪
✓车型: 2016款 三厢 1.5L CVT向上版
✓车身类型: 轿车
✓座位数: 5
✓排量: 1.5L
✓变速箱: 自动
✓能源类型: 燃油车
✓VIN: L6T7824Z1GN008344
✓搜索关键词: 吉利汽车帝豪 2016款帝豪三厢1.5LCVT向上版

Document Information

Inspection Expiry Date2026/10
Warranty Expiry Date-
Insurance Expiry Date2026/10

Q&A

More

Can this car be exported to a certain country? What are the local restrictions?

We have established a database of target country policies. Check the specific requirements of the destination country in advance regarding vehicle age (left-hand/right-hand drive), emission standards (Euro 4/Euro 5), and steering position (left-hand/right-hand drive) to avoid customs clearance issues upon arrival.

Will OTA remote upgrades and mobile app control still work after the vehicle is exported overseas?

We must inform you objectively: Most Chinese car manufacturers' connected services (cloud servers) are restricted by data security regulations and overseas network limitations. Once the vehicle leaves China, the factory-installed SIM card will become inactive. This means that official OTA upgrades and factory mobile app remote controls (like pre-cooling the car or unlocking doors) typically cannot be used overseas. The vehicle will operate as a standalone version, but this will not affect basic driving and physical button functions.

Is the delivery date specified in the contract based on the "Estimated Time of Departure (ETD)" or the "Date of Arrival at Port"?

Our legal delivery milestone is based on the "Estimated Time of Departure (ETD)". As long as the vehicle enters the port area and customs clearance is completed within the agreed timeframe, any delays in shipping schedules due to the shipping company's capacity adjustments will not be considered a breach on our part. The uncontrollability of maritime transport must be factored into your expectations.