Basic Information

BrandGEELY
SeriesEmgrand
Year2016
First Registration2016/10
Mileage168,000km
Transfer Count-
FuelGasoline
TransmissionCVT
Engine1.5L 109 L4
ColorRed
Seats-

Condition Description

Body components (structural/reinforcing/panels) have accident-related damage; passive safety devices defective; vehicle performance (including three-electric system) degraded or still performance-limited after repairs.

Accident inspection: main structure damaged, reinforcing parts damaged, panels damaged, hinges abnormal. Engine bay: valve cover gasket oil leak. Exterior: 1 replaced part, 6 panel repairs, 4 repainted areas. Interior: headliner dirty, headliner severely loose, left rear door panel dirty, right front door panel dirty, right rear door panel dirty, left front seat rail and mounting screws show removal marks, right front seat rail and mounting screws show removal marks; most features normal, airbag check normal, lighting system normal. Startup check: main components normal. Tools: spare tire present.

电话直连
可讲价
平台物流
可转售
VIP车源
零过户
必卖车源

Document Information

Inspection Expiry Date2026/10
Warranty Expiry Date-
Insurance Expiry Date2026/10

Q&A

More

How long does it usually take from when I pay the full amount to when the vehicle is loaded at the port in China?

Under normal circumstances, it takes 15 to 25 working days. This includes: domestic transfer of ownership (3-5 days), applying for an export license (3-5 days), inland trucking to the port (2-5 days), customs inspection and waiting for loading schedule (5-10 days). Do not trust false promises from other channels claiming 'loading within a week.'

Will my SWIFT international wire transfer be delayed due to intermediary bank issues, causing the vehicle to be resold?

As long as you provide us with a genuine and valid bank SWIFT MT103 wire transfer message (receipt) within the payment deadline specified in the contract, we will reserve the vehicle and continue with the port operations, even if the funds are held up in the intermediary bank for several days.

Is the delivery date specified in the contract based on the "Estimated Time of Departure (ETD)" or the "Date of Arrival at Port"?

Our legal delivery milestone is based on the "Estimated Time of Departure (ETD)". As long as the vehicle enters the port area and customs clearance is completed within the agreed timeframe, any delays in shipping schedules due to the shipping company's capacity adjustments will not be considered a breach on our part. The uncontrollability of maritime transport must be factored into your expectations.