Basic Information

BrandGEELY
SeriesEmgrand
Year2017
First Registration2017/01
Mileage80,100km
Transfer Count1times
FuelGasoline
TransmissionManual
Engine1.5L 109 L4
ColorWhite
Seats-

Condition Description

Localized body damage or repair marks present; structural and reinforcement components have no accident-related damage or repairs; vehicle performance (including three-electric system) has degraded or is limited.

Accident inspection: main structure damaged, reinforcement components undamaged, cover panels damaged, hinges normal; engine bay inspection: key mechanical components normal; exterior: 2 areas of sheet metal repair; interior: most features normal, airbags normal, seatbelts normal, dashboard normal, instrument readings normal, lighting system normal; start-up inspection: main components normal; on-board tools: spare tire present.

电话直连
可讲价
平台物流
可转售
车主降价
非泡水

Document Information

Inspection Expiry Date2027/01
Warranty Expiry Date-
Insurance Expiry Date2027/01

Q&A

More

Can the e-SIM card in China's new energy vehicle system be physically removed and replaced with a local SIM card from an overseas operator?

Most new car manufacturers' e-SIMs are directly soldered onto the T-Box motherboard (surface-mounted) and cannot be removed and replaced like a phone. Unauthorized desoldering of the motherboard may cause complete communication failure in the vehicle, and we strictly prohibit this operation.

I am abroad. How can I verify the authenticity of this car?

SellWellAuto platform strictly controls the export process and collaborates with independent inspection agencies to provide vehicle inspection reports directly on the platform.

Is the delivery date specified in the contract based on the "Estimated Time of Departure (ETD)" or the "Date of Arrival at Port"?

Our legal delivery milestone is based on the "Estimated Time of Departure (ETD)". As long as the vehicle enters the port area and customs clearance is completed within the agreed timeframe, any delays in shipping schedules due to the shipping company's capacity adjustments will not be considered a breach on our part. The uncontrollability of maritime transport must be factored into your expectations.