Basic Information

BrandGEELY
SeriesEmgrand
Year2024
First Registration2024/01
Mileage22,100km
Transfer Count-
FuelGasoline
TransmissionCVT
Engine1.5L 127 L4
Color
Seats5seats

Condition Description

90% new

Inspection revealed that the vehicle has been ruled out as a major accident vehicle, a flood-damaged vehicle, or a fire-damaged vehicle. The exterior has minor scratches and damage, the interior is clean with normal wear, the frame is undamaged, the engine shows normal wear, the transmission shifts smoothly, and all electrical fluid levels are normal.

Taoche Direct Sales

Configuration Highlights

✓Power Seats
✓Keyless Start
✓Auto Hold
✓Cruise Control
✓Backup Camera
✓Rear Parking Sensors
✓Digital Instrument Cluster
✓Power Mirrors
✓Heated Mirrors
✓Rear Air Conditioning

Q&A

More

How to use technology to verify that a vehicle's emissions standards comply with our country's import regulations.

Our technical report will read the environmental information from the vehicle's factory-issued documentation (including certifications like National V, National VI, etc.). You need to submit the specific emission limit data we provide (such as grams of CO, THC, NOx emissions) to your country's environmental or customs authorities for compliance comparison.

How to confirm that the car windows are all original factory parts and not replaced due to an accident?

The technician will check the production date codes and brand logos in the lower left corner of all the car's glass (including the windshield, four doors, and rear window) to see if they match the vehicle's factory date on the nameplate. If any glass is found to have a date later than the vehicle's production date, it will be recorded as evidence of a "previous damage replacement."

The bank returned my car payment due to compliance issues. Who bears the exchange rate loss and fees?

If the buyer's country is under international sanctions, or if the buyer fails to provide a legitimate source of funds leading to the bank returning the payment, all transfer fees and exchange rate losses incurred during this period are to be borne entirely by the buyer.