Basic Information

BrandHaval
SeriesM6
Year2024
First Registration2024/01
Mileage2km
Transfer Count-
FuelGasoline
TransmissionDCT
Engine1.5T 150 L4
ColorBlack
Seats5seats

Condition Description

Right front leaf, right front door, right rear door, right rear leaf, rear cover, left rear door (bodywork and painting)

Configuration Highlights

Driver/Passenger Airbags
Tire Pressure Monitoring
ISOFIX Child Seat Anchors
Keyless Start System
ABS Anti-lock Braking
Electronic Brake Distribution
Electronic Stability Control
Hill Start Assist
Auto Hold
Hill Descent Control
Multifunction Steering Wheel
Paddle Shifters
Seat Material
GPS Navigation
Low Beam Headlights
Daytime Running Lights
Adjustable Headlight Height
Power Windows
Anti-pinch Windows
Climate Control Type
Rear Air Vents

Q&A

More

What are your assessment criteria and repair recommendations for vehicles with "slight oil seepage (non-dripping)" in the engine or transmission?

As rubber seals age, "slight oil seepage (oil stains but no dripping)" is very common in used cars and is not considered a major fault. Our recommendation is: as long as the oil level does not drop abnormally, just clean and monitor it regularly after arrival, without the need to immediately incur high costs to disassemble and replace the seals.

Who is responsible if a vehicle is damaged in a rear-end collision during inland highway transport to a port in China?

Under FOB or CIF terms, all risks before crossing the ship's rail are borne by the seller (us). For minor scratches, we will provide a price discount based on the damage assessment; for serious damage, we will immediately terminate the vehicle delivery, refund the full amount, or replace it with a vehicle of equivalent configuration.

How long does it usually take from when I pay the full amount to when the vehicle is loaded at the port in China?

Under normal circumstances, it takes 15 to 25 working days. This includes: domestic transfer of ownership (3-5 days), applying for an export license (3-5 days), inland trucking to the port (2-5 days), customs inspection and waiting for loading schedule (5-10 days). Do not trust false promises from other channels claiming 'loading within a week.'