48H

Basic Information

BrandToyota
SeriesCorolla
Year2015
First Registration2015/05
Mileage72,500km
Transfer Count1times
FuelGasoline
TransmissionCVT
Engine1.6L 122 L4
ColorWhite
Seats-

Condition Description

Accident-related damage to body components (structural/reinforcing/panels). Passive safety devices are defective. Vehicle performance (including three-electric system) is degraded or remains limited after repairs.

Accident inspection: main structure damaged, reinforcing parts undamaged, cover panels undamaged, hinges normal. Engine bay: key mechanical components normal. Exterior: none. Interior: left second-row seat damaged, left front seat dirty, left front seat damaged, headliner dirty. Most features normal, airbags normal, lighting system normal. Start-up inspection: main components normal. Onboard tools: none.

可讲价

Document Information

Inspection Expiry Date2027/05
Warranty Expiry Date-
Insurance Expiry Date2027/05

Q&A

More

Can you handle the complex communication regarding Scrap Tax and e-PTS for the Russian market?

Our responsibility ends with delivering the vehicle to the Russian border or Far East port and providing the legal Chinese export documents. The payment of Scrap Tax, application for SBKTS (Vehicle Structure Safety Certificate), and activation of the final e-PTS electronic passport must be fully handled by the Russian buyer and their local customs broker.

Is the freight from port to port calculated per vehicle or by volume (CBM)?

RoRo ships usually charge based on the vehicle's volume (length x width x height, calculated in CBM) in tiers; container shipping has a fixed compartment price. We will calculate which method is the most economical for the current sailing.

Is the delivery date specified in the contract based on the "Estimated Time of Departure (ETD)" or the "Date of Arrival at Port"?

Our legal delivery milestone is based on the "Estimated Time of Departure (ETD)". As long as the vehicle enters the port area and customs clearance is completed within the agreed timeframe, any delays in shipping schedules due to the shipping company's capacity adjustments will not be considered a breach on our part. The uncontrollability of maritime transport must be factored into your expectations.