24H

Basic Information

BrandToyota
SeriesCorolla
Year2017
First Registration2017/09
Mileage56,500km
Transfer Count-
FuelGasoline
TransmissionCVT
Engine1.2T 116 L4
ColorGrey
Seats-

Condition Description

Vehicle has major accident/fire/water damage or major defects in power battery components (structural/reinforcing/panel parts), repaired or unrepaired, still affecting body structural integrity or safe use, with hidden fault risks.

Accident inspection: main structure damaged, reinforcing parts damaged, panels damaged, hinges abnormal. Engine bay: key mechanical components normal. Exterior: 1 replaced part, 1 panel repair, 1 repaint. Interior: most functions normal, airbags normal, seatbelts normal, dashboard normal, instrument readings normal, lighting system normal. Startup test: main components normal. No tools included.

电话直连
可讲价
平台物流
车主降价
零过户
新检测标准升级>
非泡水

Document Information

Inspection Expiry Date-
Warranty Expiry Date-
Insurance Expiry Date2027/05

Q&A

More

Are all external lighting systems of the vehicle (headlights, taillights, turn signals) confirmed to be functioning properly before leaving the factory?

Yes, all external lighting sources, including low beams, high beams, fog lights, daytime running lights, reverse lights, and brake lights, are included in the mandatory power-on testing.

Do you support using cryptocurrencies like USDT for cross-border vehicle procurement settlements?

Absolutely not. Exporting used cars requires clear proof of foreign currency receipts in USD/EUR (water bill) to be provided to the Chinese foreign exchange administration, customs, and tax authorities for document verification. Cryptocurrencies are considered illegal settlement channels.

If I choose to abandon cargo at the destination port due to a cash flow issue, can I get a refund of the deposit and freight I previously paid?

No, it is absolutely impossible to get a refund. Not only will there be no refund, but if the proceeds from the port auction of the abandoned cargo are insufficient to cover the exorbitant demurrage and disposal fees, the shipping company and customs will still pursue you (the bill of lading recipient) for the remaining debt through international legal proceedings.