Basic Information

BrandToyota
SeriesCorolla
Year2022
First Registration2022/01
Mileage6.8km
Transfer Count-
FuelGasoline
TransmissionCVT
Engine1.5L 121 L3
ColorWhite
Seats-

Condition Description

Front hood painting, left front fender painting, left front door painting, left rear door painting, left rear fender painting, rear tailgate painting, right rear fender and right front fender painting.

Configuration Highlights

✓Driver/Passenger Airbags
✓Front/Rear Side Airbags
✓Front/Rear Curtain Airbags
✓Knee Airbags
✓Tire Pressure Monitoring
✓ISOFIX Child Seat Anchors
✓ABS Anti-lock Braking
✓Electronic Brake Distribution
✓Electronic Stability Control
✓Hill Start Assist
✓Auto Hold
✓Multifunction Steering Wheel
✓Seat Material
✓Low Beam Headlights
✓Daytime Running Lights
✓Auto Headlights
✓Adjustable Headlight Height
✓Power Windows
✓Anti-pinch Windows
✓Climate Control Type
✓Lane Departure Warning
✓Active Safety System

Q&A

More

What is the standard for natural air loss during parking if the vehicle is equipped with air suspension?

Air suspension is very delicate. If, after the vehicle has been stationary for about 12 hours, the height on one side of the vehicle drops more than 1.5 cm when measured from the wheel arch to the tire, we will determine that there is a slight air leak in the air spring or distribution valve on that side and warn you of the high subsequent repair costs.

Will the second-hand new energy vehicle come with a charging gun (portable charger)?

If the original owner included the factory slow charger, we will package and ship it together; if it's lost, the platform does not provide it. Note that the factory plug is a Chinese three-prong socket, and an adapter is needed overseas.

What qualifications do the third-party testing organizations have? Are they internationally recognized (e.g., SGS)?

We mainly collaborate with professional organizations certified by China's national CMA (Certification of Inspection and Testing Institutions). If you need the highest level of international endorsement, we can arrange for independent inspection agencies like SGS or TÜV to conduct Pre-Shipment Inspections (PSI) before loading at the port.