48H

Basic Information

BrandVolkswagen
SeriesGolf
Year2014
First Registration2014/11
Mileage156,100km
Transfer Count-
FuelGasoline
TransmissionManumatic
Engine1.6L 110 L4
ColorWhite
Seats-

Condition Description

Vehicle has major defects in structural/reinforced/cover parts due to accident, fire, water damage, or power battery-related components; repaired or unrepaired, still affecting body structural strength or safe use, with hidden fault risks.

Accident inspection: main structure undamaged, reinforced parts damaged, cover parts undamaged, hinges normal; engine bay: key mechanical components normal; exterior: 2 sheet metal repairs, 1 paint job; interior: most features normal, airbag normal, seatbelts normal, dashboard normal, instrument check normal, lighting system normal; startup check: main components normal; tool kit: absent.

电话直连
可讲价
平台物流
可转售
零过户
新检测标准升级>
泡水-轻度

Document Information

Inspection Expiry Date2026/11
Warranty Expiry Date-
Insurance Expiry Date2026/11

Q&A

More

Can the e-SIM card in China's new energy vehicle system be physically removed and replaced with a local SIM card from an overseas operator?

Most new car manufacturers' e-SIMs are directly soldered onto the T-Box motherboard (surface-mounted) and cannot be removed and replaced like a phone. Unauthorized desoldering of the motherboard may cause complete communication failure in the vehicle, and we strictly prohibit this operation.

Do you provide English versions of official repair manuals or circuit diagrams for used cars from Chinese brands?

Mainstream Chinese automakers rarely publish official English versions of their underlying circuit diagrams. We can provide some models' original Chinese technical documents (PDF) for B2B clients, which you will need to translate for your local mechanics using translation software.

How long does it usually take from when I pay the full amount to when the vehicle is loaded at the port in China?

Under normal circumstances, it takes 15 to 25 working days. This includes: domestic transfer of ownership (3-5 days), applying for an export license (3-5 days), inland trucking to the port (2-5 days), customs inspection and waiting for loading schedule (5-10 days). Do not trust false promises from other channels claiming 'loading within a week.'