Basic Information

BrandVolkswagen
SeriesLavida
Year2018
First Registration2018/10
Mileage77,000km
Transfer Count-
FuelGasoline
TransmissionManumatic
Engine1.6L 110 L4
ColorBlack
Seats-

Condition Description

Body components (structural/reinforcing/panels) have accident-related damage; passive safety devices defective; vehicle performance (including three-electric system) degraded or performance limited after repairs.

Accident inspection: main structure damaged, reinforcing parts damaged, panels undamaged, hinges normal; engine bay: key mechanical components normal; exterior: 1 replaced part, 3 panel repairs, 4 repainted areas; interior: most features normal, airbags normal, seatbelts normal, dashboard normal, instrument readings normal, lighting system normal; startup check: major components normal; tool kit: absent.

电话直连
可讲价
平台物流
可转售
零过户
非泡水

Document Information

Inspection Expiry Date2026/10
Warranty Expiry Date-
Insurance Expiry Date2026/10

Q&A

More

How is liability defined if the battery pack is damaged during long-distance sea transport due to extreme temperatures?

This is considered a force majeure risk. We will require the vehicle's state of charge (SOC) to be maintained in a safe dormant range of 30%-50% before loading, and we will insure you for all marine risks under CIF terms. If the battery suffers thermal runaway total loss due to abnormal cargo hold temperatures, the insurance company will compensate.

What is demurrage? How to avoid it?

Demurrage is a penalty charged by the port or shipping company for not clearing and picking up goods on time after they arrive. To avoid it: send customs documents in advance and ensure the recipient is prepared with duties and import qualifications.

What is the latest time to request changes to the consignee and notify party on the bill of lading?

Changes must be requested before the shipping cut-off date (SI Cut-off Date) prior to the vessel's departure. Once the vessel has sailed, the shipping company will charge a high amendment fee, which may also cause delays in customs clearance at the destination port, with costs borne by the buyer.