Basic Information

BrandVolkswagen
SeriesLavida
Year2018
First Registration2018/12
Mileage62,000km
Transfer Count1times
FuelGasoline
TransmissionManumatic
Engine1.6L 110 L4
ColorWhite
Seats-

Condition Description

Body components (structural/reinforcing/panels) have accident-type damage; passive safety devices are defective; vehicle performance (including three-electric system) is degraded or remains performance-limited after repairs.

Accident inspection: main structure damaged, reinforcing parts damaged, panels damaged, hinges normal. Engine bay: key mechanical components normal. Exterior: 1 replaced part, 2 panel repairs, 6 repainted areas. Interior: most features normal, airbag normal, seatbelts normal, dashboard normal, instrument readings normal, lighting system normal. Startup inspection: main components normal. Tool kit: absent.

电话直连
可讲价
平台物流
可转售
非泡水

Document Information

Inspection Expiry Date2026/12
Warranty Expiry Date-
Insurance Expiry Date2027/02

Q&A

More

Are you responsible for re-spraying the chassis anti-rust coating (armor) if it is eroded by salt spray during sea transport?

No, we are not responsible. The high salt and humidity of the marine environment do have an impact on the chassis surface. We recommend buyers in tropical islands or countries that use salt for winter snow removal to perform a thorough chassis anti-rust spray locally immediately after the vehicle arrives.

Why do different colors of the same car FOB have significant price differences?

Supply and demand determine prices. In the Chinese market, mainstream colors like black and white have much higher resale values and market circulation speeds compared to less popular colors (like pink or bright green). Therefore, there is a price difference of thousands of RMB for specific colors at the procurement level.

How long does it usually take from when I pay the full amount to when the vehicle is loaded at the port in China?

Under normal circumstances, it takes 15 to 25 working days. This includes: domestic transfer of ownership (3-5 days), applying for an export license (3-5 days), inland trucking to the port (2-5 days), customs inspection and waiting for loading schedule (5-10 days). Do not trust false promises from other channels claiming 'loading within a week.'