Basic Information

BrandVolkswagen
SeriesSantana
Year2017
First Registration2017/08
Mileage94,300km
Transfer Count1times
FuelGasoline
TransmissionManual
Engine1.4L 90 L4
ColorWhite
Seats5seats

Condition Description

Accident-related damage to body components (structural/reinforcing/panels); passive safety devices defective; vehicle performance (including three-electric system) degraded or performance-limited after repairs.

Accident inspection: main structure damaged, reinforcing components damaged, panels damaged, hinges abnormal; engine bay: key mechanical components normal; exterior: 2 parts replaced, 5 panel repairs, 5 repainted areas; interior: headliner dirty, most features normal, airbag system normal, lighting system normal; startup check: main components normal; tool kit: absent.

电话直连
可讲价
平台物流
可转售
新检测标准升级>
非泡水

Document Information

Inspection Expiry Date2027/08
Warranty Expiry Date-
Insurance Expiry Date2027/08

Q&A

More

If the technical report contains highly specialized automotive mechanical terms, are there easy-to-understand English explanations?

Our foreign versions of the report standardize terminology and include illustrations. For example, instead of just writing "control arm failure," we specify "Lower Control Arm Bushing Torn" to help your local technicians identify the issue directly.

If a car frequently transfers between extremely cold areas (like Northeast China) and extremely hot areas (like Hainan), would you provide special risk warnings?

Absolutely. The extreme temperature fluctuations will significantly accelerate the aging of chassis rubber parts, oil seals, and interior plastics. For vehicles frequently dispatched across such latitudes, we will conduct fatigue resistance checks on chassis rubber parts that are twice as stringent as those for vehicles in temperate regions.

The bank returned my car payment due to compliance issues. Who bears the exchange rate loss and fees?

If the buyer's country is under international sanctions, or if the buyer fails to provide a legitimate source of funds leading to the bank returning the payment, all transfer fees and exchange rate losses incurred during this period are to be borne entirely by the buyer.