48H

Basic Information

BrandVolkswagen
SeriesTharu
Year2024
First Registration2024/02
Mileage20,000km
Transfer Count-
FuelGasoline
TransmissionDCT
Engine1.5T 160 L4
ColorGrey
Seats5seats

Condition Description

Vehicle performance is good. No accident-related damage or repairs to structural, reinforcing, or outer panel components. No damage to the three electric systems (battery, motor, electronic control).

Accident inspection: no damage to main structure, reinforcing components, outer panels, or hinges. Engine bay inspection: key mechanical components normal. Exterior: none. Interior: most features normal; airbags, seatbelts, dashboard, instruments, and lighting system normal. Startup inspection: main components normal. Tool kit: none.

电话直连
可讲价
平台物流
可转售
抵押车
零过户
新检测标准升级>
非泡水

Document Information

Inspection Expiry Date2028/02
Warranty Expiry Date-
Insurance Expiry Date2027/01

Q&A

More

What is a battery SOH certificate and why does it matter when buying a used EV from China?

SOH (State of Health) measures the battery's remaining capacity as a percentage of its original capacity. Two EVs with the same mileage can have very different SOH depending on charging habits and climate exposure, and since the battery represents 30-50% of a used EV's value, the SOH number is effectively the real price tag. A proper certificate includes current SOH percentage, cell voltage balance, charge cycle counts, battery management system fault codes, and often a projected range estimate. In hot-climate markets like the Gulf, a degraded battery degrades even faster, so a documented SOH above 85-90% is strongly recommended. Exporters who provide verified SOH certificates close deals faster and command better prices, so treat the certificate as a core purchase document, not an extra.

Large international wire transfers (T/T) usually require anti-money laundering (AML) review. What materials will you provide to assist?

If your remitting bank requires verification of the transaction's authenticity, we will promptly provide: a commercial invoice (PI) signed and stamped by both parties, a scanned copy of the vehicle purchase contract, and our legal export enterprise registration certificate from the Ministry of Commerce in China.

Will my SWIFT international wire transfer be delayed due to intermediary bank issues, causing the vehicle to be resold?

As long as you provide us with a genuine and valid bank SWIFT MT103 wire transfer message (receipt) within the payment deadline specified in the contract, we will reserve the vehicle and continue with the port operations, even if the funds are held up in the intermediary bank for several days.