Basic Information

BrandAudi
SeriesQ3
Year2015
First Registration2015/02
Mileage103,600km
Transfer Count-
FuelGasoline
TransmissionDCT
Engine2.0T 170 L4
ColorBlack
Seats-

Condition Description

Localized body damage or repair marks present. No accident damage or repairs to structural or reinforcement components. Vehicle performance (including three-electric system) has degraded or is limited.

Accident inspection: main structure undamaged, reinforcement components undamaged, cover panels undamaged, hinges abnormal. Engine bay: valve cover gasket oil leak. Exterior: 1 replaced part, 2 panel repairs. Interior: headliner sagging, headliner dirty, lighting system abnormal, most features normal, airbags normal. Startup check: major components normal. Tool kit: missing.

电话直连
可讲价

Document Information

Inspection Expiry Date2027/02
Warranty Expiry Date-
Insurance Expiry Date2027/02

Q&A

More

Why are the shipping costs for used electric vehicles (EVs) usually higher than for internal combustion engine vehicles (ICEs)?

Pure electric vehicles are classified as Class 9 Dangerous Goods due to their large lithium batteries, leading to strict shipping regulations. Shipping companies have high requirements for the loading position and fire isolation measures for dangerous goods, and some roll-on/roll-off ships refuse to accept used EVs. As a result, EVs often require more expensive special container shipping and incur additional handling fees for hazardous materials.

Will the second-hand new energy vehicle come with a charging gun (portable charger)?

If the original owner included the factory slow charger, we will package and ship it together; if it's lost, the platform does not provide it. Note that the factory plug is a Chinese three-prong socket, and an adapter is needed overseas.

How long does it usually take from when I pay the full amount to when the vehicle is loaded at the port in China?

Under normal circumstances, it takes 15 to 25 working days. This includes: domestic transfer of ownership (3-5 days), applying for an export license (3-5 days), inland trucking to the port (2-5 days), customs inspection and waiting for loading schedule (5-10 days). Do not trust false promises from other channels claiming 'loading within a week.'