Basic Information

BrandGEELY
SeriesVision X6
Year2017
First Registration2017/08
Mileage65,000km
Transfer Count-
FuelGasoline
TransmissionManual
Engine1.8L 133 L4
ColorBrown
Seats5seats

Condition Description

very good

Locally owned, one-owner vehicle, mostly original paint, warranty guaranteed, low mileage (only 60,000+ kilometers), 1.8L automatic four-cylinder engine for durability, smoothness, and fuel efficiency.

Newly added
0 transfers

Configuration Highlights

✓ISOFIX Child Seat Anchors
✓Backup Camera
✓Cruise Control
✓Bluetooth/Hands-free
✓Smartphone Integration

Accident & Maintenance Records

Accident Record

🔗 Open Link

Maintenance Record

🔗 Open Link

Document Information

Inspection Expiry Date2026/08
Warranty Expiry Date-
Insurance Expiry Date2026/08

Q&A

More

Are all external lighting systems of the vehicle (headlights, taillights, turn signals) confirmed to be functioning properly before leaving the factory?

Yes, all external lighting sources, including low beams, high beams, fog lights, daytime running lights, reverse lights, and brake lights, are included in the mandatory power-on testing.

When shipping by RoRo vessel, is the "Terminal Handling Charge (THC)" at the destination port prepaid by your freight forwarder or paid by the buyer upon arrival?

Under international practices and our standard CIF/FOB terms, the THC at the port of origin (China) is borne by the seller; all THC and port miscellaneous charges incurred at the destination port during unloading are to be paid by the buyer (consignee) upon local customs clearance and pickup.

If the remittance info for the international wire transfer has the wrong contract number, will it cause delays in currency exchange and shipping?

It will cause serious obstacles. China's foreign exchange controls are extremely strict. If the remittance note and the remitter do not match our declared contract, the bank will reject the transaction (Pending). We will need to spend several days submitting additional explanations to the foreign exchange authority, which will inevitably delay the shipping schedule.