Basic Information

BrandGEELY
SeriesVision X6
Year2018
First Registration2018/04
Mileage80,000km
Transfer Count1times
FuelGasoline
TransmissionManual
Engine1.8L 133 L4
ColorWhite
Seats5seats

Condition Description

2018 Geely Vision X6, well-maintained original condition, two panels repainted, actual odometer 80,000 km, sunroof, electric seats, one-touch start, high configuration, good condition, third-party inspection completed.

燃油车
SUV
手动
维保开放
事故开放
查验开放

Configuration Highlights

✓品牌: 吉利汽车
✓车系: 远景X6
✓车型: 2016款 1.8L 手动尊贵型
✓车身类型: SUV
✓座位数: 5
✓排量: 1.8T
✓变速箱: 手动
✓能源类型: 燃油车
✓VIN: LB37742S3HC130998
✓搜索关键词: 吉利汽车远景X6 2016款远景X61.8L手动尊贵型

Document Information

Inspection Expiry Date2027/04
Warranty Expiry Date-
Insurance Expiry Date2027/04

Q&A

More

How can we verify the integrity of a vehicle's airbag system through technical means, ensuring it has never been deployed or repaired with resistors?

The method to deceive the dashboard warning light is to install a resistor. Our technicians will deeply read the real-time resistance values from the airbag control module (SRS Module) data stream and check for any non-factory stitching or adhesive marks on the steering wheel/passenger panel to uncover the disguise.

If the shipping company's basic freight rate (GRI) suddenly increases during the period after I place the order and before paying the final amount, who covers the difference?

Our freight rate quotes have a clear validity period. If the buyer delays the deposit payment and misses the scheduled price lock, the GRI (General Rate Increase) charged by the shipping company must be fully covered by the buyer before booking and loading can be arranged.

Under FOB terms, what should I do if the overseas freight forwarder I designated is inefficient and causes delays in booking?

Under FOB terms, booking is a legal obligation of the buyer. If your freight forwarder fails to provide the shipping order (S/O) in time, resulting in vehicles exceeding the free storage period at our warehouse or port, the buyer will have to pay the high daily storage fees before shipment.